We worked with partners when we connected the arch pieces to make the bridge. After we used nuts and bolts to connect the steel, we had to tighten them so we could add mortar and stone to the bridge later on. We lost some nails but we had more. Even though there were a lot of interruptions we still managed to focus and keep our concentration. (The metal was sharp and often we scraped our hands as we worked, but we kept on going.) Later we cemented the bridge. Now we're ready to display it.
-Sirren
| Conference Room |
|
|
|
Send your comments and feedback to AIEphiladelphia@aol.com. Architecture in Education is a program of the AIA Philadelphia Chapter This site was made possible through the generous support of WHYY and The Corporation for Public Broadcasting, and the National Endowment for the Arts. © Copyright 1996-99 |