We made our model of the Henry Ave. Bridge. One day we went to the bridge to sketch it. We went back a lot of times because we had to get certain angles of the bridge. First we had to sketch the fron and then we had to sketch the side. We also sketched the highway that goes across the bridge.
The most important thing that we had to sketch was the main arch. We also had to sketch the little arches on the main arch. We didn't have to sketch every detail through because Mr. Sole took picutres of the bridge.
-Heather
| Conference Room |
|
|
|
Send your comments and feedback to AIEphiladelphia@aol.com. Architecture in Education is a program of the AIA Philadelphia Chapter This site was made possible through the generous support of WHYY and The Corporation for Public Broadcasting, and the National Endowment for the Arts. © Copyright 1996-99 |